Individual final project according to the Federal State Educational Standards presentation. Individual project as a means of implementing federal state standards. Requirements for design work

A set of methodological materials for the development of an individual educational project at the level of basic general education

Explanatory note

I. Introduction.

A set of assessment materials for assessing meta-subject planned results of mastering the basic educational program basic general education of the municipal budgetary educational institution "Secondary comprehensive school No. 125 with in-depth study of mathematics" in Snezhinsk Chelyabinsk region in the form of a final individual project, developed on the basis of the Law “On Education in Russian Federation"(Federal Law No. 273), Federal State Educational Standard of Basic General Education, Model Basic Educational Program of Basic General Education, Basic Educational Program of Basic General Education of MBOU Secondary School No. 125, Development Program of MBOU Secondary School No. 125 until 2017 and the School Charter.

When developing the complex, we used instructive and methodological materials from regional monitoring of assessing the quality of general education and diagnostic materials developed as part of the implementation of the model of the school educational system, ensuring modern quality of education on the basis of state - public administration implementation of basic educational programs of general education.

“Meta-subject planned results are interdisciplinary concepts and universal educational actions mastered by students (cognitive, regulatory, communicative), the ability to use them in educational, cognitive and social practice, independence of planning and implementation educational activities in organizing educational cooperation with the supervisor, teachers and peers, building an individual educational trajectory"1.

Achieving meta-subject results by students is based on teaching general techniques, techniques, schemes, mental patterns

works that lie above objects, but at the same time are reproduced when working with any object material.

Project activities and the final individual project allow students, through the conscious and active appropriation of new social experience“to develop the key competencies of the individual, strive for self-development and self-improvement”2.

An objective assessment of students’ activities provides an opportunity for further development of their creative abilities and intellectual potential.

II. The purpose of creating the complex.

The status of MBOU Secondary School No. 125, the features of the school’s educational system, which ensures modern quality of education based on the mechanisms of state and public management, are determined target creation of a complex: development of measuring materials for the final assessment of meta-subject planned results of students mastering the basic educational program of basic general education in the form of an individual educational project and methodological recommendations for subjects of state and public administration participating in the assessment process in accordance with the requirements of the Federal State Educational Standard LLC.

III. Structure of the complex.

The set of assessment materials for assessing the meta-subject results of mastering the basic educational program of basic general education consists of the following sections:

Regulations on project activities students within the framework of the implementation of the main educational program of the basic general

education of municipal budgetary general education

institution "Secondary school No. 125

with in-depth study of mathematics";

Assessment card for the student’s individual final project at the level of basic general education;

Instructional materials for the student and self-assessment card;

Methodological materials for the project manager;

Attachments to the director's orders:

Control plan for the Deputy Director for educational work behind the organization project work 9th grade students;

Consultation plan for public experts;

- a list of topics for students’ individual final projects and a list of supervisors.

IV. Contents of the complex.

1. Position on the project activities of students within the framework of the implementation of the main educational program of basic general education of the municipal educational institution “Secondary comprehensive school No. 125 with in-depth study of mathematics” determines all stages of work on the individual final project, while training in project activity skills is carried out at all levels of general education. In accordance with the requirements of the Federal State Educational Standard of LLC and the main educational program of basic general education MBOU Secondary School No. 125, the Regulations contain:

Requirements for organizing work on an individual final project,

Requirements for the content and focus of students’ individual final projects,

Requirements for the design of an individual final project,

Timing and stages of implementation of individual final projects,

Requirements for the protection of an individual final project,

Criteria for evaluating individual final projects.

The Regulations also present ways of presenting intermediate results of students’ project activities: presentations at a school scientific and practical conference, Litvinov’s readings, at an open conference of young researchers from CATU cities.

2. Assessment card for the student’s individual final project at the level of basic general education

The main object of assessment of meta-subject results is the formation of students' cognitive, regulatory and communicative universal educational actions. The main procedure for the final assessment is the student’s defense of an individual final project. The criteria for assessing the level of development of students' meta-subject planned results, developed during the testing of regional monitoring of the quality of general education, became the main criteria in assessing the individual final project at the basic and advanced levels. The mission of the school with in-depth study of mathematics, the objectives of the main educational program of basic general education, the results of internal monitoring of the quality of general education make it possible to present the basic and advanced level of development of meta-subject results. The assessment card identifies the skills and abilities of project activities related to the criteria:

Ability to independently acquire knowledge and solve problems,

Formation of subject knowledge and methods of action,

Formation of regulatory actions,

Formation of communicative actions.

Assessment of the level of development of meta-subject results at the basic and advanced levels is reflected in the number of points awarded during the defense of the project by the head of the individual final project and the expert commission. Of particular importance in this case is the development of personally significant skills and abilities of project activities acquired independently (without the help of a manager) in the process of working on the project, as well as an in-depth study of the problem and the practical orientation of the project.

3.Instructional materials for the student and self-assessment card

To work on an individual final project, students are offered the following instructional materials:

Plan form work on an individual final project: the plan is drawn up by the student independently or with the help of a supervisor after approval of the project topic by order of the director and the appointment of a supervisor and helps organize work on the project throughout the entire academic year. Project topics are posted on the school website and on information boards.

Public speaking is a test for a student, so the complex includes memo"How to prepare public speaking" And evaluation paper, which not only help the student prepare to defend the project, but also preliminarily assess their capabilities and make the necessary adjustments.

Requirements for registration of an individual project, sample project passport and recommendations for computer presentation serve as informative materials and materials for monitoring the presentation of the final product of project activity; they allow you to objectively assess the maturity of the student’s ICT competence.

Self-esteem card individual project and questionnaire“What we managed to learn during the work on the project was developed with the aim of developing the ability of students to objectively evaluate the product of their own work and timely correction of the project. The assessment criteria were selected taking into account the student’s experience of intermediate certification in the form of defending a project in class. Self-esteem develops critical thinking, the ability to think independently and choose the right ways solve problems and learn new ways of doing things.

Questionnaire for students “What did you learn while working on the project?” allows the student to highlight those design skills and abilities that were acquired during independent work on the project and see the prospects for their development.

Terminological dictionary serves as an assistant in writing and presenting an individual final project.

4. Methodological materials for the project manager :

surveillance map over the progress of the individual final project, which was proposed during the testing of regional monitoring of the quality of general education;

Profile - support- a form of pedagogical reflection. It is offered to the project manager in order to analyze his activities during collaboration with the student and filled in after completion of the work;

Rough plan individual consultations help the manager respond in a timely manner to questions that arise during the work on the project and correct the material already developed by the student independently;

Review requirements for an educational project.

The opinion of the project manager, stated in the review, is of great importance for the student and is necessarily taken into account by the experts.

5. Instructional materials and methodological recommendations for public experts.

Public experts who are members of the commission and are representatives of state public administration bodies of Municipal Budgetary Educational Institution Secondary School No. 125 take part in assessing the meta-subject results of students in the form of an individual final project. The following have been developed for them and are included in the complex:

guidelines, which include the necessary concepts and reveal the essence of the criteria for assessing students’ individual final projects, as well as the criteria for assessing the levels of development of project activity skills. According to methodological recommendations consultations are held with public experts, experts study the Regulations on project activities and participate in the assessment of projects during the school scientific and practical conference.

As information material For public experts, materials are offered that reveal the meaning of the concept of “skills and abilities formed in the process of project activities.”

6. Control plan Deputy Director for Academic Affairs for the organization of project activities of 9th grade students - part of internal monitoring and is included in the internal school control plan. The purpose of control is to provide conditions for the successful development of the student’s individual final project and to provide methodological assistance to the head of the educational project.

V. Conclusions and generalizations.

A set of assessment materials for assessing the meta-subject planned results of mastering the basic educational program of basic general education in the form of an individual final project allows you to objectively assess at different levels the degree of development of students’ project activity skills, as well as the ability to manage their activities, including adjusting and defining new tasks in according to the changing situation. The materials of the complex are of an analytical and educational nature, because in the process of assessing the meta-subject planned results of mastering the basic educational program of basic general education and in the process of working on an individual final project “learning itself occurs in the process of activity.”

This personal-activity approach to the development of assessment materials provides the opportunity for cooperation between students, managers, and project consultants. The complex ensures participation in assessment procedures of all subjects of state and public school management. The complex ensures compliance with the requirements of the Federal State Educational Standard of general education in terms of the system for assessing meta-subject planned results of students mastering the basic educational program of basic general education and can be used in educational organizations of the region that have specialized classes, as well as with minor changes in secondary schools in the region, because the components of the complex as a whole are universal

Position

on the project activities of students within the framework of the implementation of the main educational program of basic general education of the municipal educational institution "Secondary school No. 125 with in-depth study of mathematics"

1.General provisions

1.1. These Regulations have been developed on the basis of the Law “On Education in the Russian Federation” (No. 273-FZ), the Federal State Educational Standard of Basic General Education, the Model Basic Educational Program of Basic General Education, the Basic Educational Program of Basic General Education, MBOU Secondary School No. 125 and Charter.

1.2. Project activity is understood as a purposefully organized activity that brings together teachers, students, parents (legal representatives) and social partners.

1.3. Project work is an activity carried out by students within one or more academic subjects (integrated project), helps improve the quality of education, allows you to use the knowledge gained, master various forms and methods practical work.

1.4. Project activity of students is one of the methods of developmental (personally-oriented) training, aimed at developing independent research skills (posing a problem, collecting and processing information, conducting experiments, analyzing the results), helps the development of creative abilities and logical thinking.

1.5. The inclusion of students in project activities is one of the ways to increase the motivation and effectiveness of educational activities at all levels of education, which ensures that students achieve the meta-subject planned results of mastering the basic educational program of basic general education.

1.6. All pedagogical structures of the school and public administration bodies of MBOU Secondary School No. 125 participate in the organization and provision of the project.

1.7.Project is a form of organization joint activities student (students) and leader (teachers, parents, social partners), aimed at achieving the goal and solving a problem that is significant for the student, formalized in the form of a final product.

2. Purpose and objectives of project activities

2.1.Target project activities - creating conditions for cooperation, partnership of participants educational process, joint search for new complex knowledge, mastering the ability to use this knowledge when creating your own intellectual product, in demand by the community; development of creative abilities, logical thinking and social maturation.

2.2.General tasks:

strengthen, improve and creatively develop the existing system of project activities at school;

expand case study areas in project activities;

strengthen the prestige of participation in project activities, cultivate a conscious, responsible attitude towards activities in the project and educational sphere;

expand the boundaries of practical use of students’ design work;

involve social partners in project activities and strengthen various mutually beneficial contacts.

2.3.Learning Objectives:

teach planning your own activities;

develop the skill of collecting and processing information and materials, including on the Internet;

develop the ability to analyze (creativity and critical thinking);

form and develop the ability to write a written report on independent work on an individual final project;

develop a positive attitude towards work and an active life position;

to form a system of interdisciplinary integration and a holistic picture of the world.

2.4.Educational tasks:

to cultivate in students an interest in understanding the world, in-depth study of disciplines, identifying the essence of processes and phenomena in all areas of activity;

motivate students to choose a profession, professional and social adaptation;

to form a unified school scientific community with its own traditions.

3. Project as a form of final certification of students at the level of basic general education

3.1.Individual final project is an educational project carried out by 9th grade students within the framework of one or more academic subjects in order to demonstrate their achievements in independent mastery of the content and methods of selected areas of knowledge and/or types of activities and the ability to design and carry out expedient and effective activities (educational, cognitive, design , social, artistic and creative).

3.2.The individual final project must be feasible and appropriate to the age, abilities and capabilities of the student.

3.3.The topic of the individual final project should be interesting for the student and coincide with his zone of proximal development.

3.4. An individual final project may include one aspect of the selected problem, thereby being open to its further study.

3.5.The individual final project must have a practical orientation and be in demand, and be able to be used in one or another area of ​​human activity.
3.6. The individual final project is the main object for assessing the meta-subject results obtained by students during the development of educational programs in academic subjects.
3.7. Completion of an individual final project is mandatory for each student; failure to complete it is equivalent to receiving an unsatisfactory grade in any academic subject.

3.8. The results of completing an individual final project can be considered as an additional basis for enrolling a 9th grade graduate in his chosen field of specialized education at the level of secondary general education.

4. Requirements for organizing work on an individual final project

4.1. General management of the project activities of students at MBOU Secondary School No. 125 at the level of basic general education is carried out by the head of the science and mathematics laboratory and the deputy director for academic work.

4.2. The leaders of students’ project activities are teachers who implement the Federal State Educational Standard for basic general education.

4.3. The manager or consultant of the student’s individual final project can be teaching staff, parents (legal representatives) of students, employees of other organizations related to the project profile (social partners).

4.4. The student is the initiator in choosing a project leader.

4.5. The project manager is appointed by order of the director.

4.6. Project leaders:

Organize the student’s work on an individual final project,

Submit an application to manage the student’s project activities, a work plan for consideration by the school’s methodological council;

Seek advice from specialists at the request of students,

Conduct individual consultations with students experiencing difficulties at different stages of work,

Announce the participation of students in competitions at various levels,

4.7. Students independently choose the subject area in which work on an individual final project will take place.

4.8. Students, together with the leader, choose a topic, determine the result (product) of the work and its genre features, and plan activities.

4.9. Interim examination of the project is carried out by a commission of the methodological council through analysis of the product of project activity.

4.10. The deadlines for defending individual final projects are approved by order of the director.

4.11. Public defense of individual final projects is carried out in accordance with the regulations of elective exams.

5. Requirements for the content and focus of individual final projects

5.1.An individual final project can be

single-subject - related to certain areas of knowledge;

meta-subject - related to a specific area of ​​activity;

by dominant activity:

information (search) is aimed at collecting information about an object, phenomenon, familiarizing project participants with it, analyzing it and summarizing facts;

research - subject to the logic of a small study, has a structure that coincides with the study;

creative - offers the most free approach to presenting the result (performance, script, concert, show, action, etc.);

practice-oriented (applied) - aimed at the social interests of project participants or the customer;

gaming (role-playing) - participants in such projects take on certain roles determined by the nature and content of the project.

5.2. Presentation of individual final projects can be carried out in the form:

computer presentation describing the product,

demonstration of a device, model, design (including LEGO), website or page,

script, excursion, poster reports, photo album, model, essay, collection creative works, video, map, piece of music, game, business game, business plan, etc.;

diagrams, algorithms, tables, manuals (including on electronic media), collection of exercises, workshops,

an abstract including the results of the experiment, experiments, solutions, etc.

6. Requirements for the design of an individual final project.

6.1 The individual final project must contain:

product of project activity;

project passport of no more than 4 typewritten pages (A-4 format, font Times New Roman, size 14, spacing - 1, top and bottom margins - 2 cm, right - 3 cm, left -1.5 cm, width alignment, indent -1.25), in which the following are highlighted:

title page containing:

Full name educational organization,

Year of its implementation;

an explanatory note indicating:

The purpose and objectives of the project;

A brief description of the progress of its implementation and the results obtained;

List of literature and material and technical resources;

6.2.The individual final project also includes a brief review from the project manager (review).

6.3. Applications (graphs, diagrams, tables, etc.) are placed in a separate block.

6.4. All pages of the individual final project (except for the title page) are numbered.

6.6.Each section begins with new page, the section heading is located in the center of the page, there is no dot after the heading.

6.4.Printed material is duplicated on disk. The cover of the folder - disc case can have elements of colorful advertising design and contain brief summary.

6.5. To participate in competitions of various levels, the work manager organizes the preparation of the appropriate documentation provided for by the competition format.

7. Timing and stages of implementation of the individual final project

7.1. The time frame for preparing and defending an individual final project is determined by the regulations and approved by order of the director.

7.2. Regulations for working on the project:

Stage/term

Result presentation

Preparatory

(September)

Determining the theme, goals and objectives of the individual final project

List of project topics

Planning

(October November)

Problem formulation;

Determination of meta-subject planned results;

Determining sources of information, methods of collection and analysis;

Determining how to present the result;

Establishment of procedures and criteria for evaluating results;

Approval of lists of students and supervisors

Project work plan

Lists of groups, appointment of leaders

Director's order

Project work

(November-March)

Proposing hypotheses, collecting information, solving intermediate problems;

Selection of tools and their application;

Consulting;

Preparation of the final product

Speech by leaders of individual final projects of students at the methodological council, at a meeting of the organizing committee of the NOU

Intermediate protection. Correction, result evaluation (March)

Formulation of conclusions;

Intermediate defense (in the classroom, at school research and development, at a competition)

competitions, on the Internet

Reflection. Defense of an individual final project in the exam.

(April May)

Project examination;

Conclusions and offers;

Identification of finds. problems and search for development directions.

Project protection. Determining the level of formation of meta-subject planned results

8. Summing up the work on the individual final project

8.1. To protect individual final projects during the state final certification of 9th grade students, a special expert commission is being created at MBOU Secondary School No. 125.

8.2. The composition of the commission is determined by the public administration bodies of the school (pedagogical council, Governing Council) and approved by order of the director.

8.3.An individual final project can be presented at the annual school scientific and practical conference, open scientific and practical conferences at various levels.

8.5. If there are outstanding projects, the commission may prepare a special conclusion on the merits of the project, nominating the student for the Constellation scholarship.

9. Requirements for the protection of an individual final project

9.1.Protection of the individual final project is one of the mandatory components of the materials of the system of intra-school monitoring of students’ educational achievements.

9.2. 9th grade students submit their project as an examination paper one week before the defense for review by the commission.

9.3.The defense of the project is carried out within the time limits established for passing elective exams.

9.4. 9th grade students defend their project according to the schedule approved by the director.

9.5. Public defense of the individual final project is carried out orally with the obligatory demonstration of fragments of the project or presentation and should not exceed 10 minutes, the number of slides in the presentation is no more than 16.

9.6.After completing the speech, the student must answer the questions of the commission (if any).

9.7. The public presentation of the student’s individual final project must contain:

justification of the chosen topic, evidence of its relevance,

goals and objectives of the project and the degree of their implementation,

mandatory indication of the degree of independence of the work done,

description of the possibilities of using the product in practice in various fields of activity.;

and also takes into account:

emotional impact on listeners,

correctness of speech, artistry,

the ability to respond to questions, justifying your answer,

project design.

9.8. All demonstration materials for the defense of an individual final project must be recorded in advance on the computer used during the defense.

9.9. Students are given the opportunity to test the recording technique and quality according to a special schedule.

10. Criteria for evaluating individual final projects

10.1. The expert commission evaluates the level of development of the meta-subject planned results of 9th grade students, demonstrated by them during the implementation of the individual final project based on the consideration of the presented product and the review of the supervisor.

10.2.The individual final project is assessed according to the following criteria:

the ability to independently acquire knowledge and solve problems, manifested in the ability to pose a problem and choose adequate ways to solve it, test the decision made, justify and create a model, forecast, layout, object, creative solution;

the formation of subject knowledge and methods of action, manifested in the ability to reveal the content of the work, to competently and reasonably use existing knowledge and methods of action in accordance with the topic under consideration;

the formation of regulatory actions, manifested in the ability to independently plan and manage one’s cognitive activity over time, use resource opportunities to achieve goals, and choose constructive strategies in difficult situations;

well-formed communicative actions, manifested in the ability to clearly state and formalize the work performed, present its results, and answer questions in a reasoned manner.

10.3. When assessing an individual final project, 2 levels of development of project activity skills are distinguished: basic and advanced, the main difference of which is the degree of independence of students during the implementation of the project.

10.4. Evaluation of the student's meta-subject planned results during the defense of the individual final project occurs in accordance with the criteria for evaluating the individual final project by the project manager and members of the expert commission, which are displayed in the assessment card.

10.5. The final grade for each criterion and the final grade for the project as a whole is determined by the number of points assigned by the project manager and members of the expert commission.

CRITERION

LEVELS OF DEVELOPMENT OF PROJECT ACTIVITY SKILLS

A basic level of

INCREASED level

1.Independent acquisition of knowledge and problem solving

The work as a whole demonstrates the ability to independently, with the help of a manager, pose a problem and find ways to solve it;

Demonstrated ability to acquire new knowledge and/or learn new ways of doing things;

Demonstrated ability to achieve a deeper understanding of what has been learned.

The work as a whole demonstrates the ability to independently pose a problem and find ways to solve it;

Demonstrated fluency in logical operations, critical thinking skills, and the ability to think independently;

The ability on this basis to acquire new knowledge and/or master new methods of action and achieve a deeper understanding of the problem has been demonstrated.

2. Formation of subject knowledge and methods of action.

Demonstrated understanding of the content of the work performed;

There are no gross errors in the work and answers to questions about the content of the work.

Demonstrated fluency in the subject of project activity;

There are no errors.

3.Regulatory actions

Demonstrated skills in identifying topics and planning work;

The work was completed and presented to the commission;

Some stages were carried out under the supervision and support of the supervisor;

Demonstrated ability to analyze and distribute information;

At the same time, individual elements of the student’s self-assessment of self-control appear.

The work was carefully planned and consistently implemented, all stages of discussion and presentation were completed in a timely manner;

Control and correction were carried out independently.

4.Communicative actions

Demonstrated skills in designing project work and explanatory notes, as well as preparing presentations;

The topic is clearly defined and explained;

The text is well structured, thoughts are expressed logically and consistently, the arguments are chosen correctly;

The project is of interest from a practical point of view;

10.6. The decision that the individual final project has been completed at an increased level is made provided that:

such an assessment is given by the commission for each of the 3 criteria characterizing the maturity of meta-subject results, and the maturity of subject results can be recorded at the basic level;

none of the mandatory elements of the individual final project provides grounds for a different decision.

10.7. The decision that the individual final project has been completed at a basic level is made provided that:

such a rating is given by the commission for each criterion;

all elements of the project are demonstrated;

questions are answered.

10.8. Assessment of the student’s achievement of meta-subject results in mastering the basic educational program of basic general education in the form of an individual final project is recorded in the column “Project activity” or “Exam” in the class register and the student’s personal file. To document state standard on the level of education - certificate of basic general education- placed in a free line.

10.10. If there are outstanding projects, the commission may prepare a special conclusion on the merits of the project, nominating the student for the Constellation scholarship.

11. Responsibilities and responsibilities of the parties for violation of established standards

11.1. The head of the student’s individual final project is obliged to:

Ensure constant monitoring of the progress and implementation of the individual final project,

Provide advisory support to the student;

Provide assistance in the design and preparation for defense of an individual final project;

Provide access to information and other resources available at school.

11.2. If the leader fails to fulfill his duties, he may, by decision of the pedagogical council, with the consent of the student and his parents, be replaced by another leader.

11.3. The student is obliged:

comply with the deadlines for completing the individual final project;

comply with the requirements for the design of the project and its protection;

submit a written version of the project defense to the teacher or supervisor for verification 2 weeks before its defense.

11.4. In case of failure to comply with the requirements of these Regulations, the student is considered to have not achieved the meta-subject planned results of mastering the OOP LLC in accordance with the Procedure for conducting state final certification for educational programs of basic general education.

12. Procedure for entry into force local act

12.1. These Regulations are discussed and adopted by the pedagogical council and the Governing Council of MBOU Secondary School No. 125 and approved by order of the director.

12.2. The regulation is published on the website of MBOU Secondary School No. 125 and placed on the information stand within 3 days from the date of approval by the order.

to a computer presentation of an individual project

(level of basic general education)

The computer presentation of the project work should not exceed 15 slides.

The presentation title page includes:

full name of the educational organization;

year of project development

The text of the slides should be informative and contain basic information on all sections of the project, arranged in the order in which each section is presented.

Slides must be titled.

The visibility of the slide can be ensured with the help of animation, color effects, illustrations, graphs, diagrams, tables.

It is convenient to create computer presentations using the Microsoft program Power Point.

ATTENTION! Do not get carried away with excessive inclusion of color and animation effects, because... they distract listeners' attention from the essence of the project.

2. Score sheet for oral public speaking

FI______________________________class___________

Exercise.

Carefully re-read the text of the speech and evaluate it according to these criteria.

Criterion

Indicators

Number of points

For each

The necessary examples and arguments are given

Speech design

Presentation of the text without reading from what is written (an outline or theses are possible)

Structure of the speech: introduction, main part, conclusion.

Articulation, no errors in speech

Performance effectiveness

Interest in the audience's performance

Originality and brightness of design

Compliance with regulations

3. QUESTIONNAIRE

“What did you learn while working on the project?”

In this form, highlight with a + sign those answers to the question that you did after defending your individual final project in the exam on your own.

Plan your activities, allocate time.

Organize your work space.

Finish everything to the end.

Obtain information and select what is necessary for work.

Highlight what is important and essential.

Design the project correctly.

Achieve your goals despite mistakes and disappointments.

Listen to different opinions.

Prove your point of view.

Create a presentation with various effects (animation, drawings, videos, interviews).

Other _______________________________________________

4. Rough plan

individual consultations during work on an individual final project for a student of _________ class

__________________________________________________________

Number of hours

Determination of the topic, list of necessary literature, sources of information.

Drawing up a work plan for the project, defining goals and objectives.

Formulation of the problem and discussion of ways to solve it.

Selecting the necessary tools to work on the project (material and technical resources).

Creation of theses for each section of the project and their proof.

Creation of a complete text of the project (design of the final result, product) and its editing.

Formulation of conclusions and generalizations.

Preparation for project defense. Registration of passport and folder.

Training public speaking. Correction

Preparation of a computer presentation of the project.

Training performance with presentation.

5. SURVEILLANCE MAP

for the progress of an individual project

(for project manager)

Organizational

Check Ö true statement

The topic of the project was determined with the help of the supervisor

The topic of the project was determined independently, with the help of the manager

Check Ö true statement

Transforms a practical task into a cognitive one with the help of a supervisor

Transforms a practical task into a cognitive one with the help of a supervisor

Check Ö true statement

Formulates the problem with the help of the manager

Formulates the problem with support from the manager

Check Ö true statement

The analysis and search for the problem were carried out with the help of the supervisor.

Analysis and search for the problem were carried out with the help of the manager

Check Ö true statement

Formulates cognitive goals and objectives with the help of a manager

Independently formulates cognitive goals and objectives

Check Ö true statement

With the help of the manager, builds a system of issues that ensure the effectiveness of his own activities

With the support of a manager or independently, builds a system of issues that ensure the effectiveness of one’s own activities

Check Ö true statement

Works with text with the direct participation of the manager

Works independently with text

Check Ö true statement

Searching for information using various sources with the direct assistance of the manager

Independently or with the support of a supervisor, searches for information using various sources

Check Ö true statement

Works on creating structured texts directly with the help of a supervisor

Creates structured texts independently or with the support of a supervisor

Check Ö true statement

Builds an algorithm of activities with the help of a supervisor

Builds an algorithm of activities independently or with the support of a manager

Check Ö true statement

Makes plans, including alternative ones, with the help of the manager

Makes plans, including alternative ones, independently or with the support of a manager

Check Ö true statement

Plans a learning project with the help of a supervisor

Plans an educational project independently or with the support of a supervisor

Check Ö true statement

Adjusts its activities with the help of the manager

Makes adjustments to its activities independently or with the support of a manager

Project protection

Check Ö true statement

Prepares the educational project in accordance with the requirements with the help of the supervisor

Draws up an educational project in accordance with the requirements independently or with the support of a supervisor

Check Ö true statement

Presents the educational project in the form oral presentation using visual objects with the help of a supervisor. Does not know how to answer questions in a reasoned manner without the help of a supervisor

Independently presents an educational project in the form of an oral presentation using visual objects. Able to answer questions independently or with the support of a supervisor.

Check Ö true statement

Experiences difficulties when presenting a project, arguing and defending one’s position

Able to argue and defend his position when presenting a project

Check Ö true statement

Experiences difficulties in expressing his feelings and thoughts.

Masters monologue and dialogic forms of speech in accordance with the grammatical and syntactic norms of the native language

Check Ö true statement

With the help of the leader, constructs monologue contextual statements

Constructs monologue contextual statements independently or with the support of a leader

Check Ö true statement

With the help of the manager, determines the possibility of using the project

Owns various forms monologue and dialogic speech to solve sociocultural problems, specific determination of the possibilities of using the project results

Criteria for evaluating project activities

Check Ö true statement

Carries out preventive control on the result and method of action with the help of a teacher

Independently or with the support of a manager, carries out preventive control based on the result and method of action

Check Ö true statement

Conducts self-monitoring and self-assessment of the progress and results of the educational project (educational research) with the help of a supervisor

Independently or with the support of a supervisor, conducts self-monitoring and self-assessment of the progress and results of the educational project (educational research).

Check Ö true statement

Evaluates and makes decisions that determine further activities with the help of the manager

Evaluates and makes decisions that determine further activities independently or with the support of a manager

Total score _________________

Increased level (86-100%) - 19 - 22 points

Basic level (63-86%) - 19-15 points

Low level (0-63%) - 0-14 points

Problems that arose during the implementation of the project when observing students:

________________________________________________________________________________________________________________________________________________________

6. REMINDER

for public expert

for assessing the student’s project work

(level of basic general education, grades 5-9)

Dear member of the expert group! You evaluate the student’s individual project at the level of basic general education. We invite you to study the criteria for evaluating design work adopted at MBOU Secondary School No. 125 and take into account very important aspects when assigning points for a project.

Administrative group

Criterion

The essence of the criterion (what is taken into account)

Social significance of the project

The relevance of the problem being solved during the project work.

Direction and possibility of application of the project.

Formulation and methods of solving the problem

The adequacy of the project to the problem posed and ways to solve it.

Depth and originality of problem solving

Logical connections, correctness of research methods, knowledge of the issue, choice of solution to the problem.

Compliance between goal and result

The degree of solution to the problem, development of the final product.

Project design

Design, selection of examples, presence of errors.

Project presentation

Ability to speak clearly, answer questions, defend your point of view, demonstrate a project.

INDIVIDUAL FINAL PROJECT

AS A MEANS OF IMPLEMENTING GEF

PERFORMED

KLYUVITKINA LYUDMILA VLADIMIROVNA


Final individual project developed according to requirements :

  • Federal State Educational Standard for Basic General Education
  • Basic educational program of basic general education
  • Program for the formation of universal educational activities

  • section 1.3. The system for assessing the achievement of the planned results of mastering the basic educational program of basic general education p. 108-114 is written:

Assessment of the achievement of meta-subject results can be carried out during various procedures.

The main procedure for the final assessment of the achievement of meta-subject results is protection of the final individual project .


The final individual project -

educational project carried out by students within one

or several academic subjects

in order to demonstrate

your achievements.


  • Completion of the final individual project is mandatory for every student studying according to the Federal State Educational Standard
  • Defense of the individual final project is one of the mandatory components of the materials of the system of internal monitoring of educational achievements.

  • The individual final project (IIP) must satisfy the following conditions:
  • the presence of a socially or personally significant problem;
  • the presence of a specific social addressee of the project “customer”;
  • independent and individual nature of students’ work;
  • The project is interdisciplinary, supradisciplinary, i.e. not limited to one academic discipline.

Goals of the final individual project

  • Demonstrate graduates’ ability and readiness to master systematic knowledge, independently replenish it, transfer and integrate it.
  • Reveal students' ability to cooperate and communicate.
  • To develop the student’s ability to solve personally and socially significant problems and implement the solutions found into practice.
  • Assess the learner's ability and readiness to use ICT for learning and development purposes.
  • Determine the level of development of the student’s ability to self-organization, self-regulation and reflection.

Objectives of the final individual project

  • Planning training (the student must be able to clearly define a goal, describe the steps to achieve it, and concentrate on achieving the goal throughout the entire work).
  • Formation of skills in collecting and processing information and materials (be able to select appropriate information and use it correctly).
  • Development of the ability to analyze, formation of creativity and critical thinking.
  • Formation and development of public speaking skills.
  • Formation of a positive attitude towards activities (show initiative, complete work on time in accordance with the established plan)

  • Meta-subject and inter-subject projects are welcomed, the leaders of which can be several teachers.
  • The work includes not only the collection, systematization and synthesis of information on the proposed problem, but also represents an independent study demonstrating the author’s vision of the problem, its original interpretation or solution.
  • The project must have a practical orientation, be in demand and be able to be used in one or another area of ​​human activity

The role of the teacher

  • Select types and products of project activities that would be adequate to the age of the project participants;
  • Formulate the goals of the upcoming work so that they are accessible, understandable, and, no less important, interesting and meaningful to students;
  • Help students find the right sources of information;
  • Be a source of information yourself;
  • Coordinate the entire process of student activities;
  • Encourage students.

Project protection requirements

  • Protection is carried out in the process of specially organized public defense of IIP.
  • The commission may include teachers, heads of educational institutions, administration of the educational institution .

The more adults encourage independence

and the child's self-confidence,

the higher the degree of personal self-realization in adolescence

and older age.


  • The ability to independently acquire knowledge and solve a problem, which is manifested in the ability to pose a problem and choose adequate ways to solve it, including searching and processing information, formulating conclusions and/or justifying and implementing/testing the decision made, justifying and creating a model, forecast, model, layout, object, creative solution, etc. This criterion generally includes an assessment of the formation of cognitive educational actions.
  • Formation of subject knowledge and methods of action, manifested in the ability to reveal the content of the work, competently and reasonably, in accordance with the problem/topic under consideration, use existing knowledge and methods of action.

General criteria for evaluating project work

  • Formation of regulatory actions, manifested in the ability to independently plan and manage one’s cognitive activity over time, use resource capabilities to achieve goals, and choose constructive strategies in difficult situations.
  • Formation of communicative actions, manifested in the ability to clearly state and formalize the work performed, present its results, and answer questions with reason.

The mark for completing the final individual project is placed in the column “Design and research activities"in the class magazine and personal file.

In the certificate of basic general education, the mark for the final project is placed in a free line.

The topic of the project and the results of its defense in the form of a certificate (certificate) are necessarily placed in the student’s portfolio


The only path leading to knowledge

this is an activity.

Bernard Sh OU


A project is always research, search, study of the unknown...

Learn a lot of new things and

learn to do something you couldn’t do before


Individual project(FSES clause 11). An individual project is a special form of organizing students’ activities (educational research or educational project). An individual project is carried out by the student independently under the guidance of a teacher (tutor) on a chosen topic within the framework of one or more academic subjects studied, courses in any chosen field of activity (cognitive, practical, educational and research, social, artistic and creative, other). The results of an individual project should reflect: the development of skills in communication, educational and research activities, critical thinking; ability for innovative, analytical, creative, intellectual activity; development of skills in project activities, as well as independent application of acquired knowledge and methods of action in solving various problems, using knowledge of one or more academic subjects or subject areas; the ability to set goals and formulate research hypotheses, plan work, select and interpret the necessary information, structure the argumentation of research results based on the collected data, and present the results. An individual project is carried out by the student for one or two years within the framework of study time specifically allocated by the curriculum, and must be presented in the form of a completed educational research or developed project: informational, creative, social, applied, innovative, design, engineering.

Slide 43 from the presentation “Features of organizing training according to the Federal State Educational Standard for secondary general education in the context of the implementation of secondary vocational education programs”

Dimensions: 720 x 540 pixels, format: .jpg. To download a slide for free to use in class, right-click on the image and click “Save Image As...”. You can download the entire presentation “Features of the organization of training according to the Federal State Educational Standard of secondary general education in the context of the implementation of secondary vocational education programs.ppt” in a zip archive of 170 KB in size.

Download presentation

“Federal State Educational Standards of the NOO” - Logistical and technical support for the introduction of the Federal State Educational Standards of the NOO. On the readiness of educational institutions of the Pavlovsk region for the introduction of the Federal State Educational Standard of Non-Governmental Education. - Order of the Education Department dated April 7, 2010 No. 193 “On preparation for the introduction of the Federal State Educational Standard of Primary General Education” - Order of the Education Department dated October 21, 2010 No. 545 “On the organization of work on the transition to the Federal State Educational Standards of General Education” - Management Letter Education dated 02/28/2011 No. 165 “On monitoring readiness for implementation of the Federal State Educational Standard of NOO.”

“For parents about the Federal State Educational Standard” - What is distinctive feature new Standard? What requirements does the new Federal State Educational Standard put forward? To parents of future first-graders. 2. Teach your child to sit down for homework on time. 3. Don't force people to redo poorly done class work. What is the Federal State Standard for Primary General Education?

“Educational program of the Federal State Educational Standard” - The ability to carry out the following types of activities in electronic (digital) form: A set of technological tools that provide. Between participants in the educational process. Organizational support introduction of the Federal State Educational Standard. Olympics competitions. Upcoming events. Creation of material objects,

"FSES textbooks" - Education system"School 2100" Federal State Educational Standard for Basic General Education (2010). The differences relate primarily to the basic curricula. Federal component state standard general education (2004). Textbooks for Federal State Educational Standards. Biology.

POSITION

About the student’s individual final project according to the Federal State Educational Standard

General provisions

Goals of the final individual project

2.1. Demonstrate to graduates the ability and readiness to master systematic knowledge, carry it out independently, transfer and integrate.

2.2. Reveal the student’s ability to cooperate and communicate.

2.3. To develop in the graduate the ability to solve personally and socially significant problems and translate the solutions found into practice.

2.4. Assess the graduate's ability and readiness to use ICT for learning and development purposes.

2.5. To determine the level of development of the graduate’s ability to self-organize, self-regulation and reflection.

3. Requirements for preparing the final individual project

3.1. A plan and project preparation program for each student is developed by the educational institution.

3.2. The project manager can be either a teacher of a given educational institution or an employee of another organization or another educational institution, including a higher one.



3.3. Students choose both the topic and the project leader.

3.4. The topic of the project must be approved by the educational and methodological association of the school in the corresponding direction.

3.5. The implementation plan for the final individual project is developed by the student together with the project leader. The student is guided by the deadlines and recommendations determined jointly with the supervisor. The student has the right to start working on the project starting from the 5th. 6th, etc. class.

3.6. The deadline for defending the project is set at the beginning of the academic year.

Requirements for the content and focus of the project

4.1. Projects created at school must be dedicated to one of the current problems scientific, cultural, political, legal, social life of the modern world community.

4.2. A project can consider one aspect of a chosen problem, thereby being open, providing other creative teams with the opportunity to continue studying new aspects of this problem.

4.3. Project work includes not only the collection, systematization and synthesis of information on the proposed problem, but also represents an independent study that demonstrates the author’s vision of the problem, its original interpretation or solution.

4.4. The project must have a practical orientation, be in demand and be able to be used in one or another area of ​​human activity.

4.5. Project assignments must be clearly formulated, goals, objectives and means clearly identified.

4.6. Possible types of work and forms of their presentation:

Table 1

Project type Target Project product
Practical Solution Analysis data costume,
oriented practical problems sociological layout,
social survey, model, musical
atlas, work,
Research Proof or
refutation of some attributes multimedia
or hypotheses non-existent product,
states, reports on carried out
Informational Collecting information about
any object business plan, research,
or phenomenon Web site, holiday,
video film, publication,
Creative Attraction
interest public To exhibition, guide,
project problem. newspaper, abstract,
magazine, directory,
Gaming or Performance
role-playing experience participation V operating company system school
decision Problems a game, self-government,
project map, series of illustrations,
collection, tutorial,
computer animation, drawing,
office design, excursion
package of recommendations,
poster presentation,
script, article, fairy tale


6. Requirements for design work

6.1. Project work must be presented in printed and in electronic format(presentation, website, digital film, etc.).

– Determination of the purpose and objectives of the study.

Various types reference apparatus.

(students are required to comply with the norms and rules of citation).

– Indication of all printed, drawn, graphic, photo, video, musical and electronic materials presented in the project.

– Divided into sections or chapters presented in a logical sequence to more clearly convey the information collected.

6.3. The materials that must be prepared upon completion of the project for its protection must include:

1) the product of project activity submitted for defense, presented in one of the forms described above;

2) a short summary prepared by the student explanatory note to the project (no more than 10 sheets) indicating for all projects:

a) the original concept, purpose and purpose of the project,

b) brief description progress of the project and the results obtained,

c) list of sources used. For design projects, the explanatory note also includes a description of the features of design solutions, for social projects– description of the effects/impact of the project implementation;

3) a brief review from the manager containing brief description the student’s work during the project, including:

a) initiative and independence,

b) responsibility (including the dynamics of attitude towards the work performed),

c) performance discipline.

If there are appropriate grounds in the work performed, the review may also indicate the novelty of the approach and/or solutions obtained, relevance and practical significance obtained results.

For research projects It is mandatory to have a written report on the study (no more than 10 sheets) and an appendix, including tables, photographs, drawings, diagrams, questionnaires, etc. Mandatory structural parts of the written report are introduction and conclusion. The introduction substantiates the relevance of the research topic, defines the purpose and objectives, and research methods adequate to the subject of study. The conclusion summarizes the results research work, conclusions are drawn about the accuracy of the working hypothesis.

Written report for creative projects has its own specifics; its structure necessarily describes the author’s intention, the stages of creating the product, the technologies and materials used. The product of creative activity (product, booklet, video, wall newspaper, etc.) must be presented for defense.

Implementation report social project must contain the following structural components: description of the problem, goals and objectives of the project, alternative ways decisions, risks of project implementation; analytical description of available and missing resources for project implementation, estimate; the functions of project participants are indicated in calendar plan, where areas of personal participation and areas of responsibility of team members, points of intermediate monitoring are indicated. Planned project product at the end of the project it is compared with the result obtained.

6.4. Before being submitted to the expert commission, the disk with the design work must be carefully checked in relation to technical and demonstration parameters: launch system, tempo of movement, strength and purity of sound. If necessary, the disk must be provided with an explanatory note listing the programs required for launch.

6.5. General requirement For all works, it is necessary to comply with the norms and rules of citation and references to various sources. In case of borrowing the text of the work without indicating links to the source (plagiarism), the project is not allowed to be protected.

Project protection requirements

7.1. Protection is carried out:

1) at a school conference in March, which makes it possible to publicly present the results of work on projects and demonstrate the level of students’ mastery of individual elements of project activity

2) in the process of specially organized activities of the expert commission of MBOU Secondary School No. 162 in April.

The report reflects the purpose and objectives of the project, the main stages of project activities, and the results obtained. Presentation as a presentation/presentation of the results of project work requires students to have communication skills; the task that everyone has to solve is to present all the advantages of the project as profitably and reasonably as possible, taking into account the characteristics of the communication space and the audience.

7.2. Regardless of the type of project, its defense takes place publicly: after hearing the report (5–7 minutes), listeners and the jury ( expert advice) ask questions about the topic of the project. Compliance with the regulations indicates the development of the student’s regulatory skills. The time defense must be planned in such a way that the student can demonstrate the finished project product or present materials confirming its implementation.

7.3. A computer presentation is part of the project assessment as one of the options for visibility of the defense, but its creation and use should be dictated by the requirements of feasibility and efficiency.

Annex 1

Sample application

To the director

MBOU School No. 162 Samara

Kochkurova E. Ya.

____________________________________­­­­­­­­­­­­­­

student(s) 8 "__" class.

STATEMENT

I ask for permission to complete the final individual project (IIP) in the following area:_________________________________________________________

___________________________________________________________________________

IIP topic _________________________________________________________________

______________________________________________________________________________________________________________________________________________________

and assign ________________________________________________________________ (full name of the curator) as the curator of my IIP.

“___” _________________20__year ___________________

student's signature

“I have read the statement and agree with the chosen direction and topic”

"___"________________20__year ___________________

parents' signature /

legal representatives

Appendix 2

Memo for students

"Explanatory note to the project"

Introduction, which requires:

name theme of the project;

formulate the project problem that you solved when creating your project, show why it is interesting and important not only for you, but also for others;

tell what the goal of your project is, what you achieved as a result of your work, justify that, having achieved the goal of the project, you have solved the problem of the project;

indicate what kind of design you made product, show connection between the topic, problem, goal and product of your project;

give expanded, detailed work plan for the project indicating all the main stages and all the smaller steps within each stage, the expected results of each stage, the deadlines for completing each stage.

In the introduction, the words should be highlighted in bold: topic, goal, problem, hypothesis (of all projects where it exists), project product, plan.

Main part.

In the main part, you should show what solution to the project problem you found and how you implemented it in the project product, provide a description of the progress of your work on the project, including justifying all the decisions you made and ideas that arose in your mind, all the resources that you used in your work.

The materials from which you created the design product; people who helped you, including the guys who took part in your surveys, classroom hours, lessons, etc.; the information you used and where you got it - all these are resources for your project work.

In addition, in the main part you can show your point of view on the project problem and justify it, referring to your own research, observations, experiments, surveys, analysis of the information you found, and the opinions of experts.

Conclusion

In conclusion you need to:

Analyze all your efforts to achieve the goal of the project (what was the most difficult and the easiest, what was the most interesting and memorable, what you learned while working on the project, how your views changed, etc.);

Evaluate the result of your project (what worked or didn’t work for you and why; did you manage to achieve what you planned when you started your project and why, how would you act to avoid mistakes if you started your work again) ;

Show the prospects for possible further work on the problem of your project (what would you advise to someone who is interested in your work and who wants to continue developing it further, whether your own interest in the problem of the project has been exhausted).

List of information sources used, where you will present:

List of printed sources used in alphabetical order, indicating the imprint of books and articles;

Addresses of Internet sites you worked with;

Films, museum exhibitions, etc., if they are sources of information on your project.

Appendix 3

Approximate plan for speaking at the defense of the project

Introduction

The topic of my project………………………………………………………..……….

I chose this topic because…………………………………….....……….

The purpose of my work is …………………………………………………………………………………

The project product will be –………………………………………………………..

This product will help achieve the project goal because……………………

My work plan (indicate completion time and list all intermediate stages):

ž Gathering information (what and how I looked for information)…………………………………

ž Manufacturing the product (what and how you did it)…………………………………….……..

ž Writing the written part of the project (how I did it)…………………..…….

Main part

I started my work by………………………………

Then I started………………………………………………………

I concluded the work by………………………………………

During my work I encountered the following problems……………………………..

To cope with the problems that have arisen, I……………………………

I deviated from the plan (indicate when the work schedule was disrupted)…………………

My work plan was disrupted because……………………………

During the work, I decided to change the project product because……………

But still I managed to achieve the goal of the project because…………………

Conclusion

Having finished my project, I can say that everything that was planned worked out, for example………………………………………………………

This happened because…………………

If I were to start over again, I would……………………………

IN next year I may continue this work in order to…………

I think I have solved the problem of my project as………………

Working on the project showed me………………………


Appendix 4

Sample project evaluation sheet.

Sample project evaluation sheet:

________________________________________________________________

(Project name)

Performer: ___________________________________, student___ ".." class

Project Manager: _________________________________,

Conclusion: _____________________________________________________

Date “___”_______________ 201...

Appendix 5

Stages of work on the project.

Problem Determining the thematic field and topic of the project, searching and analyzing the problem, setting the project goal, choosing the project name
Design (planning) Discussion possible options research, comparison of proposed strategies, selection of methods, collection and study of information, determination of product form and product requirements, drawing up a work plan, distribution of responsibilities
Search for information Carrying out planned technological operations, making necessary changes
Product Preparation and defense of the presentation
Presentation reflection Analysis of the results of the project, assessment of the quality of the project
Portfolio Evaluation of results A folder that contains all the working materials of the project, drafts, plans, reports, research and analysis results, diagrams, drawings, photographs, an electronic version of the educational project for presentation

Appendix 6

An approximate action plan for a student’s project activities.

Deadlines Content Responsible
1. Formation of a list of topics for project work. 2. Familiarization with the list of project topics for students and their parents (legal representatives). 1. Subject teachers 2. Class teacher
Selecting a project topic. Students and class teachers, subject teachers
Approval of project topics by the school director. Class teachers
Drawing up an action plan for its implementation, beginning research stage. Project managers
Studying literature and media materials on the subject of the project. Determining the work structure. Students and project managers
Making adjustments to initial plans and plans, approving the wording of topics.
Preparation of electronic materials for the project, completion of the research phase of the work. Students and project managers
Preparation of printed and electronic materials on the project, submission to the project manager for evaluation, preparation of the project defense. Students and project managers
Preparation of project defense. Pre-protection. Students and project managers
1.Project protection. 2. Evaluation of projects by members of the expert commission Students and project managers, members of the expert group
1. Registration of the results of project activities in the student’s Portfolio. 2.Writing characteristics Students Class teachers

POSITION

about the student’s individual final project according to the Federal State Educational Standard

General provisions

1.1. This provision is drawn up on the basis of the main educational program of basic general education (FSES LLC) of MBOU School No. 162.

1.2. The individual final project is the main object for assessing the meta-subject results obtained by students during the development of interdisciplinary educational programs.

1.3. An individual final project is a project completed by a student in one or more academic subjects.

The goal of the project: “to demonstrate your achievements in independent mastery of the content of selected areas of knowledge and types of activities, the ability to design and carry out expedient and effective activities (educational, cognitive, design, social, artistic and creative)”

1.4. Completion of an individual final project is mandatory for every 9th grade student studying under the second generation Federal State Educational Standard.

1.5. Failure by a graduate (9th grade) to complete an individual final project is equivalent to receiving an unsatisfactory grade in any academic subject.

1.6. Defense of an individual final project is one of the mandatory components of the system of in-school monitoring of educational achievements.

1.7. The results of an individual project can be considered as additional grounds for enrolling a graduate of a basic general school in his chosen field of specialized education in high school.

Student's individual project

Excerpts from the document“Approximate basic educational program of an educational institution. Basic school / [comp. E. S. Savinov]. - M.: Education, 2011,

section 1.3. System for assessing the achievement of planned results

mastering the basic educational program of basic general education p.108-114

Assessment of the achievement of meta-subject results can be carried out during various procedures. The main procedure for the final assessment of the achievement of meta-subject results is protection of the final individual project.

An additional source of data on the achievement of individual meta-subject results can be the results of testing (usually thematic) in all subjects.

During the ongoing, thematic, interim assessment, the achievement of such communicative and regulatory actions can be assessed that are difficult or impractical to check during a standardized final test, for example, the level of development of cooperation or self-organization skills.

Assessment of the achievement of meta-subject results is also carried out within the framework of the intermediate certification system. To assess the dynamics of formation and level of formation of meta-subject results In the system of intra-school monitoring of educational achievements, all of the above data (the ability to cooperate and communicate, solve problems, etc.) are most appropriate to record and analyze in accordance with those developed by the educational institution:

a) a program for forming the planned results of mastering interdisciplinary programs;

b) a system of intermediate certification (in-school monitoring of educational achievements) of students within class and extracurricular activities;

c) a final assessment system for subjects that are not included in the state (final) certification of students;

d) tools for assessing the achievement of planned results within the framework of current and thematic control, intermediate certification (intra-school monitoring of educational achievements), final certification in subjects that are not submitted for state final certification.

At the same time, the mandatory components of the system of intra-school monitoring of educational achievements are the following materials:

starting diagnostics;

Current execution educational research and educational projects;

intermediate and final complex works on an interdisciplinary basis, aimed at assessing the formation of cognitive, regulatory and communicative actions when solving educational, cognitive and educational and practical tasks based on working with text;

Current sample execution educational-practical and educational-cognitive tasks to assess the ability and readiness of students to master systematic knowledge, their independent replenishment, transfer and integration; ability to cooperate and communicate, to solve personally and socially significant problems and to translate solutions into practice; ability and willingness to use ICT for learning and development; abilities for self-organization, self-regulation and reflection;

protection of the final individual project.

Features of individual project assessment

An individual final project is an educational project carried out by a student within the framework of one or more academic subjects in order to demonstrate their achievements in independent mastery of the content and methods of selected areas of knowledge and/or types of activities and the ability to design and implement expedient and effective activities (educational, cognitive, design, social, artistic and creative, other).

Completion of an individual final project is mandatory for each student; failure to complete it is equivalent to receiving an unsatisfactory grade in any academic subject.

In accordance with the objectives of the project preparation the educational institution develops a plan and project preparation program for each student, which, at a minimum, should include requirements for the following headings:

Organization of project activities;

Project protection;

Criteria for evaluating project activities.

Requirements for organizing project activities should include provisions that students themselves choose both the project topic and the project leader 1 ; the topic of the project must be approved (the level of approval is determined by the educational institution; the project implementation plan is developed by the student together with the project leader). An educational institution may impose other requirements for the organization of project activities.

In the section about requirements for content and focus of the project It is mandatory to indicate that the result of project activities must have a practical orientation. This section also describes: a) possible types of work and forms of their presentation and b) composition of materials, which must be prepared upon completion of the project to protect it.

For example, result (product) of project activities could be any of next works:

A) paperwork(essay, abstract, analytical materials, review materials, research reports, poster presentation, etc.);

b) artistic creative work(in the field of literature, music, visual arts, screen arts), presented in the form of a prose or poetic work, dramatization, artistic recitation, performance of a musical work, computer animation, etc.;

V) material object, layout, other design product;

G) reporting materials on a social project, which can include both texts and multimedia products.

IN composition of materials, which must be prepared upon completion of the project for its protection, must include:

1) submitted for defense product of project activity, presented in one of the forms described above;

2) prepared by the student brief explanatory note to the project(no more than one typewritten page) indicating for all projects: a) the original concept, purpose and purpose of the project; b) a brief description of the progress of the project and the results obtained; c) list of sources used. For design projects The explanatory note also includes a description of the features of design solutions for social projects- description of the effects/impact of the project implementation;

3) short review from the manager, containing a brief description of the student’s work during the project, including: a) initiative and independence; b) responsibility (including the dynamics of attitude towards the work performed); c) performance discipline. If there are appropriate grounds in the work performed, the review may also highlight the novelty of the approach and/or solutions obtained, the relevance and practical significance of the results obtained.

A common requirement for all works is the need to comply with the norms and rules of citation and references to various sources. In case of borrowing the text of the work (plagiarism) without indicating references to the source, the project is not allowed to be protected.

In the section about project protection requirements it is indicated that the defense is carried out in the process of specially organized activities of a commission of an educational institution or at a school conference. The latter form is preferable, since it is possible to publicly present the results of work on projects and demonstrate the level of students’ mastery of individual elements of project activity.

The results of the project are assessed based on the results of the commission's review of the presented product with a short explanatory note, the student's presentation and the supervisor's feedback.

Criteria for evaluating project work are developed taking into account the goals and objectives of project activities on at this stage education. It is advisable to evaluate an individual project according to the following criteria:

1.Ability to independently acquire knowledge and solve problems, manifested in the ability to pose a problem and choose adequate ways to solve it, including searching and processing information, formulating conclusions and/or justifying and implementing/testing the decision made, justifying and creating a model, forecast, model, layout, object, creative solution, etc. n. This criterion generally includes an assessment of the formation of cognitive educational actions.

2.Formation of subject knowledge and methods of action, manifested in the ability to reveal the content of the work, competently and reasonably, in accordance with the problem/topic under consideration, use existing knowledge and methods of action.

3.Formation of regulatory actions, manifested in the ability to independently plan and manage one’s cognitive activity over time, use resource capabilities to achieve goals, and choose constructive strategies in difficult situations.

4.Formation of communicative actions, manifested in the ability to clearly present and formalize the work performed, present its results, and answer questions with reason.

The results of the completed project can be described on the basis of an integral (level) approach or on the basis of an analytical approach.

At integral description results of the project, a conclusion about the level of development of project activity skills is made based on an assessment of the entire set of main elements of the project (product and explanatory note, review, presentation) for each of the four criteria mentioned above.

At the same time, in accordance with the adopted assessment system, it is advisable to distinguish two levels of development of project activity skills: base And elevated. The main difference between the selected levels is degree of independence student during the implementation of the project, therefore, identifying and recording during the defense what the student is able to do independently and what only with the help of the project manager is the main task of the assessment activity.

Below is an approximate content description of each of the above criteria 2.

Approximate content description of each criterion

Criterion

Levels of development of project activity skills

Base

Elevated

Independent knowledge acquisition and problem solving

The work as a whole demonstrates the ability to independently, with the help of a manager, pose a problem and find ways to solve it; demonstrated ability to acquire new knowledge and/or master new ways of acting, to achieve a deeper understanding of what has been learned

The work as a whole demonstrates the ability to independently pose a problem and find ways to solve it; demonstrated fluency in logical operations, critical thinking skills, and the ability to think independently; demonstrated ability on this basis to acquire new knowledge and/or master new ways of acting, to achieve a deeper understanding of the problem

Subject Knowledge

Demonstrated understanding of the content of the work performed. There are no gross errors in the work and in answers to questions about the content of the work.

Demonstrated fluency in the subject of project activity. No errors

Regulatory actions

Demonstrated skills in identifying topics and planning work. The work was completed and presented to the commission; some stages were carried out under the supervision and support of the supervisor. At the same time, individual elements of self-esteem and self-control of the student appear

The work was carefully planned and consistently implemented, all necessary stages of discussion and presentation were completed in a timely manner.

Control and correction were carried out independently

commu- nication

Demonstrated skills in designing project work and explanatory notes, as well as preparing a simple presentation. The author answers questions

The topic is clearly defined and explained. The text/message is well structured. All thoughts are expressed clearly, logically, consistently, and with reasoning. The work/message is of interest. The author freely answers questions

The decision that the project has been completed at an advanced level is made on the condition that: 1) such an assessment is made by the commission for each of the three criteria that characterize the formation of meta-subject skills (the ability to independently acquire knowledge and solve problems, the formation of regulatory actions and the formation of communicative actions). The maturity of subject knowledge and methods of action can be recorded at a basic level; 2) none of the mandatory elements of the project (product, explanatory note, manager’s review or presentation) provides grounds for a different decision.

The decision that the project has been completed at the basic level is made provided that:

1) such an assessment is given by the commission for each of the criteria presented;

2) demonstrated All mandatory elements of the project: a completed product that meets the original plan, a list of sources used, positive feedback from the manager, presentation of the project;

3) questions were answered.

In the case of outstanding projects, the commission can prepare a special conclusion on the merits of the project, which can be presented upon admission to specialized classes.

Thus, the quality of the completed project and the proposed approach to describing its results make it possible to generally assess the ability of students to produce a product that is meaningful for themselves and/or for other people, the presence of creative potential, the ability to complete a task, responsibility and other qualities formed at school.

The mark for completing the project is placed in the “Project activity” or “Exam” column in the class journal and personal file. In a state-issued document on the level of education - a certificate of basic general education - the mark is placed in a free line.

The results of an individual project can be considered as an additional basis for enrolling a graduate of a general education institution in his chosen field of specialized education.

If necessary, selection for admission to specialized classes can be used analytical approach to the description of the results, according to which, for each of the proposed criteria, quantitative indicators are introduced that characterize the completeness of the manifestation of project activity skills. At the same time, as the theory and practice of pedagogical measurements shows, the maximum score for each criterion should not exceed 3 points. With this approach, achieving the basic level (the “satisfactory” mark) corresponds to receiving 4 primary points (one point for each of the four criteria), and achieving advanced levels corresponds to receiving 7-9 primary points (the “good” mark) or 10-12 primary points (mark “excellent”).

A similar approach, accompanied by more detailed description criteria or the introduction of special criteria reflecting certain aspects of project activity (for example, the formation of problem-solving skills, or the ability to work with information, or certain communicative competencies), can be used in the current educational process when teaching skills to carry out project activities. When using detailed or special criteria for each of the selected criteria, separate scales are developed and their criterion description is given.

1 The project manager can be either a teacher of a given educational institution or an employee of another organization or another educational institution, including a higher one.

2 An educational institution can clarify, supplement and/or change the proposed criteria, taking into account the features of the method used in this educational institution assessment system, as well as taking into account the subject focus of ongoing projects.